Our Operations


Rocksure specialises in mining, construction and related supportive services in West Africa

BOGOSO PROJECT

Rocksure International has actively been rendering load & haul and production drilling for Golden Star Resources, Bogoso/Prestea since mid-2010 at various pits such as Bogo North, Chujah, Busichem, Pampee, Prestea e.t.c. Rocksure International has currently been awarded a new mining contract for a new surface operations at Prestea South starting July 2015, with an expected project average production of about 250,000 BCM per month.

Scope of work includes:

➢ Load and Haul
➢ Production Drilling
➢ Dewatering
➢ Material Haulage (An average distance of 25 km from the Prestea South Pits to the Bogoso Golden Star Resources ROM Pad)

The project is currently running with Sandvik Pantera DP 1500 & DP 1500i drill rigs, Hitachi EX 1200-6, CAT 385, Volvo EC 700 Excavators and Volvo A40F Articulated Dump Trucks and a number of ancillary gears.


Rocksure specialises in mining, construction and related supportive services in West Africa

AYANFURI

Rocksure International has since February 2015 been mining the Fobinso Stage III cut back project for Perseus Mining Limited at Ayanfuri with an average production of 360,000 bcm per month.

Scope of work includes:

➢ Load and Haul
➢ Production Drilling
➢ Blasting
➢ RC Drilling
➢ Dewatering
➢ Crushed Ore Stockpile management

The project is currently running with Sandvik Pantera DP 1500i drill rigs, SCHRAMM RC rig, Komatsu PC 1250 & PC350 excavators, Komatsu HD 785-7 Dump Trucks (100 t), a number of supporting gears. A brand new multi-purpose Sandvik DR560 Drill Rig ideal for drilling production and RC in-pit grade control holes is expected to be added to the fleet for the project.


Rocksure specialises in mining, construction and related supportive services in West Africa

DAMANG

Damang Project is a Blast Hole Drilling contract with Goldfields Ghana Limited, Damang site. Rocksure has been the sole contractor handling production blast hole drilling activities for Goldfields Ghana Limited, Damang since August 2013.

Scope of work at Damang Goldfields:

➢ Production Blast Hole Drilling
➢ Pre-split drilling

The project is currently running with 9 Sandvik Pantera DP 1500i drill rigs (with 8 rigs engaged in peak production periods and 6 rigs during low production periods), drilling to depths up to 20m in production blast holes. Expected project average production is 60,000 meters. Our fleet of production drill rigs is expected to increase in the coming months with the acquisition of 2 new DP 1500i Sandvik Pantera drill rigs.